CuNi 70/30 90/10 Long Weld Lap Joint Stub End Fittings DIN15-600 China Manufacturer
| Features | Easy To Install, Durable | Product Name | Stub End Fittings |
|---|---|---|---|
| Color | Metallic (natural Steel Color) | Connectiontype | Weld Neck |
| Surface | Paint Spraying | Connection Type | Butt Weld |
| Certifications | ASME B16.9, ASTM A403 | Standard | ASME B16.9, ASME B16.25 |
| Wall Thickness | SCH 10 - SCH XXS | End Type | Stub End |
| Application | Pipeline Systems, Pressure Vessels | Manufacturingprocess | Forging And Machining |
| Schedule | 10S | Packing | Standard Packing |
| Size Range | 1/2 | Surface Treatment | Galvanized |
| Highlight | CuNi 70/30 stub end fittings,long weld lap joint stub ends,DIN15-600 stub end fittings |
||
| Lap Joint Stub Ends ASME B16.9,MSS SP-43 1/2 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]()
1. 20 + years of production experience at your service.
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice.
5. 100% export.
6. Our products export to Africa, Oceania, mid east, eastern Asia, Western Europe etc.
Packaging Details: Pallet/Wooden Case or as per your Specification
Delivery Detail: Shipped in 30 days after payment
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=10000USD, 100% in advance. Payment>=10000USD, 50% T/T in advance ,balance before shippment.

