SS304 Nickel-Plated Stub End Fittings, ASME B16.5 Standard for Long Weld Lap Joint
| Place of Origin | China |
|---|---|
| Brand Name | TOBO/ METAL |
| Certification | BV/ SGS/ TUV/ ISO |
| Model Number | Stub End Fittings |
| Minimum Order Quantity | 1 PC |
| Price | Negotiatable |
| Packaging Details | plywood case or pallet |
| Delivery Time | 15-30workdays |
| Payment Terms | Western Union, L/C, T/T |
| Supply Ability | 100000000 Piece/Pieces per Month |
| Product Name | Stub End Fittings | Surface Treatment | Pickling, Sandblasting |
|---|---|---|---|
| Temperaturerange | -50°C To 600°C | Surface Finish | Pickled, Sandblasting, Polishing |
| Surfacefinish | Polished, Painted, Galvanized | Surface | Paint Spraying |
| Standard | ASME B16.9, ASME B16.25 | Applications | Petrochemical, Chemical, Oil & Gas, Etc. |
| Sizerange | 1/2 Inch To 48 Inches | Connection | Welding |
| Application | Pipeline Systems, Pressure Vessels, Chemical Processing | Connection Type | Butt Weld |
| Testing | Hydrostatic Test, Radiographic Inspection | Connectiontype | Butt Weld |
| Size Range | 1/2 | Shape | Equal |
| Highlight | SS304 nickel-plated stub end fittings,ASME B16.5 stub end fittings,long weld lap joint fittings |
||
SS304 Nickel-Plated Stub End Fittings, ASME B16.5 Standard for Long Weld Lap Joint
Our stub end fittings are manufactured in strict accordance with the ASME B16.5 standard, using high-quality SS304 stainless steel as the base material, and then nickel-plated to enhance corrosion resistance and service life. Designed specifically for long weld lap joints, the fittings feature a seamless structure, ensuring tight connection with the pipeline and effectively preventing leakage.
The nickel-plated surface not only improves the appearance but also enhances resistance to oxidation, moisture, and chemical corrosion, making it suitable for harsh working environments such as chemical plants, petroleum pipelines, and industrial processing systems. The precise dimensional control ensures perfect matching with various SS304 pipelines, facilitating smooth welding and firm connection. Each product undergoes strict quality inspection, including material composition testing, pressure resistance testing, and surface finish inspection, to ensure stable performance.
We support customized sizes to meet different pipeline installation needs, and the standard export packaging ensures safe transportation. These stub end fittings are easy to install, durable, and reliable, providing a practical solution for long weld lap joint applications.
| Lap Joint Stub Ends ASME B16.9,MSS SP-43 1/2 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]()
1. 20 + years of production experience at your service.
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice.
5. 100% export.
6. Our products export to Africa, Oceania, mid east, eastern Asia, Western Europe etc.
Packaging Details: Pallet/Wooden Case or as per your Specification
Delivery Detail: Shipped in 30 days after payment
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=10000USD, 100% in advance. Payment>=10000USD, 50% T/T in advance ,balance before shippment.

