Copper Nickel Lap Joint Stub End Long / Short Pattern Welded With Flange Nipple

Place of Origin CHINA
Brand Name TOBO
Certification ISO
Model Number Stub End
Minimum Order Quantity 50
Price NEGOTIATION
Packaging Details CARTON
Delivery Time 15WORKSDAY
Payment Terms L/C, T/T
Supply Ability NEGOTIATION

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Features High Strength, Corrosion Resistance, Easy Installation Size 4
Packing Standard Packing Shape Round Shape
Finish Polished Temperature Range Up To 1000°F
Country Of Origin United States Standards ASME B16.9, MSS SP-43
Surface Paint Spraying Application Piping Systems
Type Long Type Standard ASME B16.9
Thickness 2.5MM Head Code Round
Technics Casting
Highlight

Long Pattern Stub End

,

Flange Nipple Stub End

,

Welded Stub End

Leave a Message
Product Description
Product Description

Ti alloy R50400/GR.2 schedule 40 titanium tee butt weld t shape pipe fittings

Common titanium material

Alloy composition

 

GB ATME JIS DIN
Ti TA0 R50250/GR.1 1type 3.7025
  TA1 R50400/GR.2 2type 3.7035
  TA2 R50550/GR.3 3type 3.7055
  TA3 R50700/GR.4 4type 3.7065
  TA7 GR.6   3.7115
Ti-0.23Pb TA9 R52400/GR.7 12type 3.7235
Ti-0.3Mo-0.8Ni TA10 R53400/GR.12   3.7105
Ti-3Al-2.5V TC2 R56320/GR.9    
Ti-6Al-4V TC4 R56400/GR.5 60type 3.7175
Product Name Stainless steel tee Product Type Equal tee
Size 1/2-72 inch DN15-DN1200 15-1200
Material

Ti alloy:ASTM R50250/GR.1

 

| R50400/GR.2

 

|R50550/GR.3

 

|R50700/GR.4

 

|GR.6

 

|R52400/GR.7

 

|R53400/GR.12

 

|R56320/GR.9

 

|R56400/GR.5

Standard DIN2527, DIN2566, DIN2573, DIN2576, DIN2641, DIN2642, DIN2655, DIN2656, DIN2627, DIN2628, DIN2629,
DIN 2631, DIN2632, DIN2633, DIN2634, DIN2635, DIN2636, DIN2637, DIN2638, DIN2673

DIN :

 

BS4504 , BS4504, BS1560, BS10
Standard ASME B16.9 Type Seamless or weld
Application Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc

 

 
 
 

Copper Nickel Lap Joint Stub End Long / Short Pattern Welded With Flange Nipple 1Copper Nickel Lap Joint Stub End Long / Short Pattern Welded With Flange Nipple 2Copper Nickel Lap Joint Stub End Long / Short Pattern Welded With Flange Nipple 3

Company Information
Copper Nickel Lap Joint Stub End Long / Short Pattern Welded With Flange Nipple 7

ABOUT US

We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicians. We have five branch factories which can supply the best quality pipes, tubes, fittings flanges and related accessories.

Product testing
Copper Nickel Lap Joint Stub End Long / Short Pattern Welded With Flange Nipple 8
Process flow

Copper Nickel Lap Joint Stub End Long / Short Pattern Welded With Flange Nipple 9

Certification

Copper Nickel Lap Joint Stub End Long / Short Pattern Welded With Flange Nipple 10

Our Advantages
Copper Nickel Lap Joint Stub End Long / Short Pattern Welded With Flange Nipple 11

WHY CHOOSE US

TEAM

More than 120 top-class mills

EQUIPMENT

A number of advanced equipments

QUALITY

Company with a variety of detection devices

FACTORY

We have five branch factories

If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.

If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term cooperated agent also available.

FAQ

FAQ

1. Are you trading company or manufacturer ?

We are manufacturer ,You can see the Alibaba certification.

2. How long is your delivery time?

Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

3. Do you provide samples ? is it free or extra ?

Yes, we could offer the sample for free charge but need pay the cost of freight.

4. What is your terms of payment ?

Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.